Electrical Protection Engineer

Sri Sai Overseas Recruitments

  • Vadodara, Gujarat
  • Permanent
  • Full-time
  • 2 months ago
Contact : Charles Christian || 6351557887 || charles@srisaioverseas.comPosition Details:Job Role: Electrical Protection EngineerExperience Required : 12+ Years in oil and gas sector of which at least 8 years must have been as protection engineer.Previous working experience in power plants is an advantage.Working knowledge of electrical safety rules, switching programs& PTW regulations.Experienced in inspection and testing of LV& HV switchgear AIS& GIS.Experience in using relays & switchgear testing equipment such as CMC356, Fluke power analyser, and CPC100.Experienced in testing of protection relays& breakers trip units (ABB, Siemens, Eaton, GEC, Alstom, Schneider, Terasaki, SI motor manager) such as (RET, REF, REM, REG, 7UM, 7UT, 7SJ, 7SK, 7RW, 7SD, MCGG, MICOM, 1150I).Experienced with protection coordination software& relays software (ETAP/Dig silent, DIGSI, PCM, Test universe.etc)A good team worker, able to communicate well in English.Ability to both mentor and coach the Electrical Technicians/ engineers for protection relays testing basics.Knowledge with ERP system& office applicationsLocation : OmanQualifications: BE/BTech in Electrical Engineering"MUST HAVE EXPERIENCE IN OIL AND GAS SECTOR"Role Summary:Carry out routine testing of existing LV& HV protection relays& switchgear according to maintenance strategy.Provide technical support for testing& commissioning of new relays as required.Participate in fault diagnosis& trouble shooting activities for protection relays / switchgear.Collaborate with other engineers and technical staff to implement protection strategies.Develop and maintain documentation related to protection systems.Update existing database & download protection relays setting.Provide On the job training to OLNG team as per plan.Participate in the planning and execution of system upgrades and improvements.Schedule the plan for testing all relays in the plant as per maintenance strategy and on time.Update protection relays setting data base and maintain latest relays back up on OLNG laptop. Contribute by personal involvement and coaching at all levels in establishing a culture based on technical transparency.Minimize mean time to repair failures and maximise mean time between failures of electrical protection equipment.

Expertia AI Technologies