
Junior Team Member - QC
- Rangpo, Sikkim
- Permanent
- Full-time
- Perform analysis for release of RM, PM, FP & water analysis and process/cleaning validation as per commitment dates
- Perform analysis for stability samples without any errors as per schedule
- Check the results of the tests performed, evaluate them against the specifications
- Review the TDS printed through LIMS for its completion before release
- Gather all the samples for analysis by checking the consignment for sampling
- Gather the essentials like standards, glassware, solvents to perform the analysis as per specification
- Operate the instruments and perform routine/stability as per SOP and safety norms
- Maintain system integrity by updating documentations and deviations on CipDox while performing operations
- Maintain all the online documentation and timely entries and supporting documents
- Prepare new documents and update existing documents as per GMP requirement
- Maintain equipment, facility and block premises as per SOP
- Perform validation, qualification and calibration as per schedule and update output of all activities in the systems
- Conduct operational studies to find improvement areas and implement new development projects
- Strive for continuous automation of processes through implementation of new processes
- Delay in performing analysis or re-planning due to frequent changes in production plans. Overcome by conducting performance dialogues and handshakes meetings identifying priorities
- Delay in performing laboratory activity due to instrument breakdown. Overcome by ensuring timely availability of parts and engineers
- Delay in releasing the batches due to non-availability of standards, glassware, chemicals. Overcome by coordinating with CFTs and escalations
- Unit Planning for daily release of RM,PM and FP (Daily)
- Site QC (Non-Routine) for essentials of analysis (Daily)
- CDC for specification changes implementation (Need Basis)
- Unit QA for non-conformances (Need Basis)
- Stores for inventory (Daily)
- Number of FP batches released: 3-4
- Number of RM analysis conducted : 3-4
- Number of studies conducted for Stability samples : 10
- Non-conformance OOS/OOT to be closed within 7 working days
- Suggestions for improvement of QC productivity to Team Leader (Routine/Stability)