Sets system-level TCP targets based on vehicle-level TCP targets
- Takes inputs from CoEs/PPH/PMH on engg. / supplier / mfg. / cost feasibility- Takes inputs from Build & Validation COE for project risks on performance &reliability- Takes inputs from PPM on planning/resource availabilityDelivery of set targets
Ensures achievement of all system as well as vehicle-level TCP targets set, there by
ensuring,- Timely release of drawings by CoEs after incorporating feedback on feasibility ofMfg / Supplier / Service with minimal reopenings- Evaluate feasible engineering solutions for timely closure of all ORCs / concernsraised by all support CoEs / labs- Delivery of Process and Product cost targets- Timely closure of all engg. decisions ( L0/L1 drawings, overall vehicle packaging /CAD/ VP design approved, etc.) with desired quality, optimum cost and minimumdeviations- Ensure timely completion of technical sign-off by CoEs to ensure that only thesuppliers capable of meeting TCP targets are signed-off- Ensures right integration of all the systems with the help of VA&VI- Suggest technical risk mitigation plans to CPH
Ensures all TCP trade-offs are in conformance with platform targets
- Solves for TCP trade-offs and reallocates TCP targets across systems/ CoEs that liewithin pre-defined limits so as to ensure that there are no overall TCP deviations
Completes engineering sign-off for project handover to manufacturing/ PVE for Launch
Deviations
Escalate to CPH if a TCP deviation is needed, ensures high quality assessment and report